IESL

Minox Replacement

Project Objectives

The objective of this project is to re-instate the Bonga Waterflood system to its original design state by installing/integrating the MINOX deoxygenation System with the new/ Improved 4th Generation units thereby establishing Bonga FPSO original waterflood system design.

Client

CLIENT- SNEPCO

Other Projects